Common in bowsers, refuellers, and trollies
-
Automatic brakes during usage
-
Sediment-proof fittings and welding joints
-
Turbulence-proof fluid storage
-
Shock-resistant mounting of tanks on chassis
-
Leak-proof system in tanks
-
3% vapor space inside MS tanks
-
Weather-proof box for MCB
-
Man-hole locking mechanism
-
-
Pressure relief valve, non-return valve, and isolation valve in pipeline and hydraulic hoses
-
Pressure vent valve and fusible plugs in tank
-
Aluminium chequered plate at top with pipe railing
-
Drainage system ensuring operator’s safety
-
Pump and tank constructed of non-corrosive material
-
Polyeurethene-based painting
-
Rust-preventive pre-coats and epoxy primer
-
Die penetration test on welding joints
-
Tanks are hydro-tested at 5 psi
-
-
-
-
Flame-proof motors to operate hoses
-
A warranty period of 12-18 months